Contact
Swenson Say Fagét: Structural Engineering for Seattle, Washington
Services Project Gallery About Us News Careers

Featured Projects

Capitol Hill Library

Bargreen Site

St. Anne's Renovation and Addition

Washington State Legislative Building


Projects by Category

Silver Lake Center
Everett, Washington

For this project the intent is to phase the construction with each of the quadrants of the site. Phase 1 includes (2) 8-story residential condo towers at the south end of the site facing the waterfront and a “surface” parking lid over two below grade parking levels that cover the interior of the site. The parking will include 300 on-grade parking spaces and 600 above grade parking spaces. Phase 2 includes a 9-story concrete mixed-use structure with below grade parking, at-grade retail, one level of above grade office/commercial and 7 levels of residential. The structures are post-tensioned concrete with concrete columns and shear walls and conventional spread footings. The roof systems for the residential areas are a mix of steel and concrete. The floor systems integrate mild-reinforced slabs and beams where geometry dictates. The design includes a detention vault, surface fire truck loading, significant amounts of landscape and a decorative colonnade.

Project Category
Mixed-use

Architect
ARCA

Year
2006

Project Gallery
 
    Copyright 2004, Swenson Say Fagét. All rights reserved. Contact by
phone at (206) 443-6212 or via email at info@swensonsayfaget.com.
Site management and multimedia by creativemediaalliance.com.